Work Samples

Here is a small selection of fabrication work we have produced for customers. Use the page links below to navigate to more examples of work.

Page 1 | Page 2 | Page 3 | Page 4

Tug-bridge

Description:
This 56m long bridge, constructed in two sections, was built for a tug berth at Dover Harbour. It depicts an example of a typical project where Midcam worked with the customer to produce the finished design and shows the scale of some of the fabrication work that can be undertaken.

Bridge

Description:
Fabricated underslung girder bridge for public access to a sporting venue.

Hopper

Description:
10 tonne hopper for dispensing moulding sand.

3 Section Marina Foot Bridge

Description:
3 section marina foot bridge. Lattice framework built to accept wooden decking and steel clad roof. Plans submitted from customer by email.
Dimensions:
8 x 2.5 x 2.8m, 12 x 2.5 x 2.8m, 8 x 2.5 x 2.8m
Material:
RHS
Weight:
6500kg (combined)
Finish:
Shot blasted to SA2.5, zinc metal sprayed and 2 part epoxy coated

Our 'one stop shop' approach to fabrication work means we are able to supply our customers with a trouble free solution, we can work with DXF files or design a tailored fabrication starting with just an outline sketch of the requirement.

If you would like us to quote for your fabrication, profiling or presswork requirements, just e-mail us with your enquiry or telephone 01226 731046. We can normally provide a quote within 48hrs.

Top of Page

© Copyright 2009 Midcam Engineering

Contact Details

Tel: (01226) 731046
Fax: (01226) 731035

Email: info@midcam.co.uk